Northern Serbia Farm:PV Energy Storage Solution
Case introduction
-
In north-central Serbia, the land is flat and fertile, with a well-developed agricultural sector. Numerous crop and livestock farms rely on stable electricity to sustain their production. However, the local power grid faces issues such as unstable power supply and high electricity costs. Equipment like water pumps for sprinkler systems and temperature-controlled oxygen supply units often shut down due to power outages or voltage fluctuations, causing electricity troubles and production losses for the farms.

To address this pain point, Hua Power has deployed 30kW/60kWh user-side energy storage projects for 3 local farms. Leveraging its core technologies, the projects enable PV energy storage for self-consumption and off-grid backup power, meeting the farms' electricity needs.



- Grid/off-grid switching technology: It can automatically switch the power supply mode based on the status of the municipal power grid, ensuring continuous electricity supply for the farms.
- Intelligent BMS: It can real-time monitor battery parameters such as voltage and temperature, optimize the battery charging and discharging strategy through algorithms, extend the service life, and enhance safety.
- Self-developed EMS: It intelligently dispatches the energy distribution among PV, municipal power, diesel generators, and energy storage, ensuring efficient electricity utilization.

In addition, the multi-unit parallel technology design reserves expansion space for the farms to scale up production and increase electricity load in the future.


During the project implementation, the Hua Power team provided full-process services. From the early-stage investigation of the farms' electricity needs, system scheme design, to equipment installation and commissioning, and training for operation and maintenance personnel, all processes were followed up by professional engineers to ensure the energy storage system was highly adapted to the farms' electricity usage scenarios.
After the project was put into operation, the electricity generated by PV panels is prioritized for powering the farms' equipment during the day, and the surplus electricity is stored in the batteries, maximizing the utilization efficiency of PV energy. When the PV power generation is insufficient, the energy storage batteries discharge to power the loads; alternatively, the system automatically switches to the municipal power mode. When the battery power is low, the municipal power fast charging function is activated to ensure the continuous operation of critical equipment such as water pumps for sprinkler systems.
.jpg)
Related Products
-
HC215P PV+Battery ESS All-in-one CabinetHC215P PV+Battery ESS All-in-one Cabinet100kW/215kWh | Reduces Footprint by 15%
-
HC50P optical storage integrated machineHC50P optical storage integrated machine50kW/50kWh | Efficient Light Storage Solution
-
HC60P-100B PV+Battery ESS All-in-one CabinetHC60P-100B PV+Battery ESS All-in-one Cabinet30kW/60kWh | PV+Battery
-
HC100P-280O PV+Battery ESS All-in-one CabinetHC100P-280O PV+Battery ESS All-in-one Cabinet50kW/100kWh | 280Ah battery energy storage solution